MCIC work with you to develop a customized URS until commissioning plan that outlines the responsibilities of design team, construction team, equipment suppliers, commissioning and Validation agent, and owner. MCIC provide the following validation and qualification services:

 

  • URS
  • Commissioning plan and protocols
  • Site Master File; preparation and application
  • Validation Plan or Master Plan (VP/VMP)
  • Standard Operating Procedures (SOP)
  • Quality Manual
  • Risk Assessment
  • Equipment Qualification and Validation Protocols (DQ, IQ, OQ, PQ, PV and CV)
  • Facility and Cleanroom validation including design and supply the environmental indicators
  • Air flow calculations
  • Differential pressure measurement between the different adjacent area
  • Particle Count Tests for non-viable particles
  • HEPA filter DOP (dispersed oil particulate) tests
  • HVAC System Qualification and validation tests
  • Laminar Flow Systems Qualification and validation
  • Safety Cabinet qualification
  • Occupational Safety and Health measurements