MCIC work with you to develop a customized URS until commissioning plan that outlines the responsibilities of design team, construction team, equipment suppliers, commissioning and Validation agent, and owner. MCIC provide the following validation and qualification services:
- URS
- Commissioning plan and protocols
- Site Master File; preparation and application
- Validation Plan or Master Plan (VP/VMP)
- Standard Operating Procedures (SOP)
- Quality Manual
- Risk Assessment
- Equipment Qualification and Validation Protocols (DQ, IQ, OQ, PQ, PV and CV)
- Facility and Cleanroom validation including design and supply the environmental indicators
- Air flow calculations
- Differential pressure measurement between the different adjacent area
- Particle Count Tests for non-viable particles
- HEPA filter DOP (dispersed oil particulate) tests
- HVAC System Qualification and validation tests
- Laminar Flow Systems Qualification and validation
- Safety Cabinet qualification
- Occupational Safety and Health measurements