Minimize material handling & operating cost by:
- Selection of right Technology
- Right Equipment
- Right Utilities
- Right Vendors/contractor
- Right Time Management Commitment
- Make it the first time
Prevention on cross contamination through following cGMP and GEP terms that will optimize the effort and cost, it can be attained by:
- Proper Layout
- Proper Area Classification
- Proper HVAC Design
- Correct Man & Material Flow
- Proper Air Distribution
- Skilled Manpower
- Technical Awareness
- Processing of multiple products concurrently which save money and decrease to probability of cross contamination
- Ensure integrity of final product
- Ensure unidirectional flow
- Optimize the processes and areas breakdown
- Upgrading & improving of the existing facility
- Modernization
- Extension
- Expansion
- Fit new Regulatory Requirements
- Advice for the future requirements
- Space management
- Machine Capacities and utilization
- Utility Design Enhancement
- Durable Civil Work (GMP Impact)
- Expansion of GMP processing area Production
- Provide the optimal layout with multiple design often competing objectives such as:
- Minimize investment in equipment (Coaching Equipment Lifecycle)
- Provide for employee/customer convenience
- Maintain flexibility of arrangement/operation
- Minimize material handling cost
- Utilize existing space most efficiently
- Can have a huge effect on productivity
- Cope with product undergoing process