Minimize material handling & operating cost by:

  • Selection of right Technology
  • Right Equipment
  • Right Utilities
  • Right Vendors/contractor
  • Right Time Management Commitment
  • Make it the first time

Prevention on cross contamination through following cGMP and GEP terms that will optimize the effort and cost, it can be attained by:

  • Proper Layout
  • Proper Area Classification
  • Proper HVAC Design
  • Correct Man & Material Flow
  •  Proper Air Distribution
  • Skilled Manpower
  • Technical Awareness
  • Processing of multiple products concurrently which save money and decrease to probability of cross contamination
  • Ensure integrity of final product
  • Ensure unidirectional flow
  • Optimize the processes and areas breakdown
  • Upgrading & improving of the existing facility
  • Modernization
  • Extension
  • Expansion
  • Fit new Regulatory Requirements
  • Advice for the future requirements
  • Space management
  • Machine Capacities and utilization
  • Utility Design Enhancement
  • Durable Civil Work (GMP Impact)
  • Expansion of GMP processing area Production
  • Provide the optimal layout with multiple design often competing objectives such as:

 

  • Minimize investment in equipment (Coaching Equipment Lifecycle)
  •  Provide for employee/customer convenience
  •  Maintain flexibility of arrangement/operation
  •  Minimize material handling cost
  •  Utilize existing space most efficiently
  •  Can have a huge effect on productivity
  •  Cope with product undergoing process